EXPECTED REDUCTION OF ENERGY NOT SUPPLIED TO CONSUMERS AFTER INSTALLATION THE IDENTIFIERS OF SINGLE-PHASE-TO-EARTH FAULT IN POWER NETWORKS WITH ISOLATED NEUTRAL

Authors

  • V. Bezruchko Chernihiv National University of Technology, Shevchenka Street, 95, Chernihiv, 14035, Ukraine
  • R. Buinyi Chernihiv National University of Technology, Shevchenka Street, 95, Chernihiv, 14035, Ukraine
  • V. Tkach JSC «Chernihivoblenergo», Goncha Street, 40, Chernihiv, 14000, Ukraine
  • O. Miroshnyk State Biotechnological University, Alchevskikh Street, 44, Kharkiv, 61002, Ukraine

Keywords:

identifier of single-phase-to-earth fault, reliability indicators, EENS indicator, electrical power networks of medium voltage

Abstract

Statistical researches of failures in medium voltage electrical power networks, which are constructed as overhead
power lines with ACSR wire, show that most failures are due to single-phase-to-earth faults, which under certain
conditions can transit into interphase faults. To reduce the energy not supplied to consumers proposed to install the
special device in the power network. The name of this device is the identifier of single-phase-to-earth fault. It is
shown that if the device is installed on supports of the overhead line of the power network, this can reduce the
expected energy not supplied to consumers (EENS) by up to 32%. Moreover, the shorter the time it takes to locate
the single-phase-to-earth fault in the power network, the greater will be the reduction in the EENS.

References

Bezruchko V. M., Buinyi R. O., Strogii A. Y.,

Tkach V. I. 2018. Application of GSM technology

for identification of phase-to-ground faults in

electric networks with isolated neutral and pin-type

isolation. Technical Electrodynamics. № 5/6. Р. 96-

doi: 10.15407/techned2018.05.096.

Bezruchko V., Buinyi R., Strogii A., Tkach V. 2019.

Іntegration of New Single-Phase-to-Ground Faults

Detection Devices into Existing SmartGrid Systems.

IEEE 6th International Conference on Energy Smart

Systems, ESS. Р. 84-87. doi:

1109/ESS.2019.8764237.

Buinyi R. O., Dіkhtiaruk І. V., Zorіn V. V. 2014. The

automatic sectionalization of the distributing

networks with high voltage of 6–10 kV with

application the disconnectors of new generation.

Technical Electrodynamics. Vol. 3/6. Р. 70-75.

Buinyi R., Zorin V. V., Tislenko V. V. 2014. How to take

into account the distribution of load in distribution

lines 10kv for optimal allocation of switches.

Electrification and automation of agriculture.

Vol. 99, Р. 1-16.

Farajollahi M., Fotuhi-Firuzabad M., Safdarian A. 2019.

Sectionalizing Switch Placement in Distribution

Networks Considering Switch Failure. IEEE

Transactions on Smart Grid. Vol. 10, Р. 1080-1082.

doi: 10.1109/TSG.2018.2867199.

Tkach V., Bezruchko V., Buinyi R. 2019. The effect of single-phase-to-ground faults on the operational

reliability indicators of overhead lines 6-10 kV

PJSC «Chernigivoblenrego». Bulletin of NTU

"KhPI". № 1. Р. 120-126. doi:10.20998/2413-

2019.01.14.

Zidan A., Khairalla M., Abdrabou A. M., Khlifa T.,

Shaban K., Abdrabou A., Shatshat R. E.,

Gaouda A. M., 2016. Fault Detection Isolation and

Service Restoration in Distribution Systems: State-

of-theArt and Future Trends", IEEE Transactions

on Smart Grid. Vol. 99. Р. 1-16. doi:

1109/TSG.2016.2517620.

Downloads

Published

2021-05-05

Issue

Section

Статті